Thursday, March 28, 2013

in the bedroom..

getcher mind out of the gutter.
phase 1: walls scraped, mudded, sanded, and the floor washed.  sort of.


phase 2: mud primed, ceiling and walls painted [with help from my pops]
phase 3: in progress - trim painting.  without a drop cloth.  dun dun dunnnn

phase 4 will be rewashing the floor.  and by that i mean actually scrubbing instead of running a mop over it.  and possibly followed by a quick refinish with some im sure highly toxic chemical blend from home depot.  good thing i bought that expensive low VOC paint..cos nothing else is.  probably including the lead paint and the plaster dust.  ...

and then i will have one room completely done!!!  

No comments:

Post a Comment

Related Posts Plugin for WordPress, Blogger...