Thursday, September 25, 2014

bathroom status: 89% done!

progress report on the longest bathroom remodel ever - top pic aug 13, bottom pic sept 18.  all i need now are for the sink faucets to be turned 90 degrees [should point outward so you turn the water toward yourself...rather than into the spout], the sink drain to stop leaking into a tupperware in the vanity, the flooring laid, window trimmed out, and the new radiator connected.

some deets
the best showerhead in the land
the bathroom is as bright as the sun.  AND I LOVE IT.
also, sliding barn door.  eeehhhxxceellent.
480 watts of LED goodness.  my phone can't manage a pic of this without having weird dark spots, but my camera handles it just fine.  check the IG if you need to see this in action
frank loves it.  the counter is large enough for him to sit on and he can sleep very comfortably in the sink. 
my fancy "space toilet".  apparently thats what the kids are calling them nowadays, what with the eco dual flush and all.  also, turns out the vast majority of single arm [not tension rod] wall mounted toilet paper holders are open on the right side.  that makes putting the holder to the right of the toilet a pain in the rump.  sooo i bought a slightly tacky free standing holder.  whateves.

2 comments:

  1. Hi Liz!
    I can't wait until it's finished to see it!
    But so far... it looks preety good!
    Kisses from Portugal!

    ReplyDelete
    Replies
    1. thank you! i can't wait until it's done either... unreliable friends. ::sigh::

      Delete

Related Posts Plugin for WordPress, Blogger...